Navigating Permits for ADU and Home Renovations in Los Angeles

ADU & remodeling permits Los Angeles 2026

Permits are a critical step in any ADU or remodeling project in Los Angeles. While the process can be complex, it ensures your home is safe, legal, and built to last. From feasibility studies and design plans to final approvals, having an experienced contractor makes all the difference.ADU & remodeling permits Los Angeles 2026

With D&H Contractors, you can enjoy a smooth, stress-free remodeling experience while we handle all the details of permitting and compliance.

Introduction

Remodeling in Los Angeles is an exciting process, but before you start construction, there’s one critical step: permits. Whether you’re building an Accessory Dwelling Unit (ADU), remodeling a kitchen, or adding a second story, the city of Los Angeles requires approval to ensure projects meet safety and zoning standards.ADU & remodeling permits Los Angeles 2026

At D&H Contractors, we know that navigating the Los Angeles Department of Building and Safety (LADBS) process can be overwhelming. This guide will walk you through what you need to know about permits for ADUs and home renovations in 2026.

1. Why Permits Are Required

Permits aren’t just red tape — they’re designed to protect homeowners, communities, and property values. They ensure:

  • Compliance with California Building Codes.
  • Safe electrical, plumbing, and structural work.
  • Accurate property records for future resale.

See LADBS’s permit overview: Los Angeles Department of Building and Safety.

2. Projects That Require Permits

Not every project needs approval, but most significant renovations do. Common examples:

  • ADUs and garage conversions.
  • Kitchen and bathroom remodels (if plumbing or electrical is involved).
  • Room additions and second stories.
  • Major structural changes or wall removals.
  • Outdoor projects like decks, patios, and pools.

Simple cosmetic updates like painting, flooring, or replacing cabinets usually don’t require permits.

3. ADU & remodeling permits Los Angeles 2026

ADUs are heavily regulated but streamlined under California law to encourage development. In 2026, the process typically includes:

  1. Feasibility Study – Checking zoning, setbacks, and parking requirements.
  2. Design Plans – Preparing blueprints and 3D renderings.
  3. Permit Submittal – Filing with LADBS for plan check and approvals.
  4. Inspections – Electrical, plumbing, and structural inspections during construction.
  5. Final Approval – Issued after the project passes all checks.
  6. Explore ourADU Construction Services.

4. Common Challenges with Permits

Homeowners often face delays due to:

  • Incomplete applications.
  • Zoning restrictions in specific neighborhoods.
  • Missing structural calculations or energy compliance reports.
  • LADBS backlog.

At D&H Contractors, we prevent these delays by handling paperwork, working with city officials, and ensuring all requirements are met from the start.ADU & remodeling permits Los Angeles 2026

5. Costs and Timelines

  • Permit fees vary depending on project size but typically range from $1,000–$10,000+.
  • Timelines: Minor remodels may take 2–4 weeks for approval, while ADUs can take 2–3 months, depending on complexity.
  • Construction delays can be minimized with experienced permit management.

6. Inspections and Compliance

Permits require multiple inspections throughout the project:

  • Foundation and framing checks.
  • Plumbing and electrical inspections.
  • Final walkthroughs before the Certificate of Occupancy is issued.

 Learn more about compliance atCalifornia Building Standards Commission.ADU & remodeling permits Los Angeles 2026

7. How D&H Contractors Simplifies the Process

Managing permits alone can feel overwhelming, but with D&H Contractors, you don’t have to. We provide:

  • Full permit management and submission.
  • Coordination with architects and engineers.
  • Communication with LADBS and city inspectors.
  • Guaranteed compliance with Los Angeles zoning and building codes.

Contact us for aFree Consultation.ADU & remodeling permits Los Angeles 2026


No. Cosmetic updates don’t, but structural, electrical, and plumbing work almost always does.


On average, 2–3 months, depending on design and city workload.


Building without permits is risky and can lead to fines, stop-work orders, or issues during resale.


Yes. We manage the entire process, from paperwork to final inspections.